Full kitchen remodel

A complete kitchen remodel takes the room back to the studs and rebuilds it to work the way you cook: new layout, cabinets, counters, plumbing, electrical, floors and lighting.

Kitchen range wall with gray cabinets, quartz backsplash, open shelving and a window over the counter

A full remodel is the right call when the problems are bigger than the finishes: a layout where two people can't cook at once, cabinets coming apart at the joints, not enough outlets, or plumbing and wiring that date from when the house was built. Rather than fixing these one at a time, a full remodel solves them together while the walls are open.

What's included in a full kitchen remodel

  • Design and drawings: a measured plan, layout options and elevations of every cabinet wall.
  • Demolition down to the studs and subfloor, with dust barriers and daily cleanup.
  • Layout changes: moving or opening walls, relocating the sink, range or refrigerator.
  • Plumbing and electrical: new supply and drain lines, dedicated appliance circuits, code-compliant outlets and a vented range hood.
  • Insulation and drywall on exterior walls while they're open.
  • New cabinets, countertops and backsplash, plus sink, faucet and hardware.
  • Flooring, lighting, paint and trim.
  • Permits, inspections and a final walkthrough.

Full remodel or refresh?

Not every kitchen needs to be gutted. If the layout works and the cabinet boxes are solid, you can often get a new look for much less with refacing or cabinet painting and new countertops. We'll tell you honestly which one your kitchen needs at the consultation.

RefreshFull remodel
LayoutStays the sameCan change completely
CabinetsRefaced or paintedAll new
Plumbing and electricalFixture swapsUpdated to current code
Construction time2 to 4 weeks6 to 10 weeks
Typical cost$XX,000–$XX,000$XX,000–$XXX,000

The schedule, week by week

  1. Before construction (4 to 8 weeks): design, selections, permit application and ordering. Cabinets set the pace.
  2. Week 1: protection, demolition and debris removal.
  3. Weeks 2 to 3: framing changes, plumbing and electrical rough-in, then inspections.
  4. Weeks 3 to 4: insulation, drywall and flooring.
  5. Weeks 4 to 6: cabinet installation, then countertop templating. Counters arrive 1 to 2 weeks after templating.
  6. Weeks 6 to 8: counters, backsplash, plumbing and electrical finish, appliances, paint and trim.
  7. Final week: final inspection, punch list and walkthrough with you.

Larger layout changes or custom cabinetry can add a few weeks. Your proposal includes a schedule for your specific project.

Signs your kitchen needs a full remodel

  • The layout fights you: two people can't cook at once, the dishwasher blocks the sink, or there's nowhere to set groceries down.
  • Cabinets are failing: sagging shelves, drawers that won't close, swollen bases under the sink.
  • Too few outlets: extension cords and power strips on the counter, or tripped breakers when the microwave and kettle run together.
  • Old plumbing or wiring: galvanized pipes, ungrounded outlets, or a range hood that doesn't vent outside.
  • The kitchen is closed off from the rooms where your family actually spends time.

One or two of these can sometimes be handled on their own. Three or more usually means a full remodel will cost less in the long run than fixing them one at a time.

What a full remodel costs

Full kitchen remodels in our area typically run $XX,000 to $XXX,000. The biggest variables are cabinet line, countertop material, and how much the layout changes. Our kitchen remodel cost guide breaks down each line item, and financing is available.

See finished kitchens

Browse kitchen remodel photos from homes in HQ City and nearby, or read what clients say about working with us.

Common questions

When is a full remodel worth it instead of a refresh?
If the layout doesn't work, the cabinets are failing, or the plumbing and wiring are original to an older house, a full remodel usually costs less over time than patching. If the layout works and the cabinet boxes are solid, a refresh with cabinet refacing and new counters may get you most of the way.
How long will I be without a kitchen?
Typically 6 to 10 weeks of construction for a full remodel. We set up a temporary kitchen area with your refrigerator and a microwave, and we schedule demolition only after cabinets and counters are confirmed.
Can you move the sink, range or walls?
Yes. Moving plumbing, gas lines and ventilation, or removing walls, is a normal part of full remodels. Load-bearing walls need an engineered beam and a permit, which we arrange and include in the price.
Is the price really fixed?
Your proposal is a fixed price for the scope it describes. The only changes come from things you choose to add, or from conditions hidden inside walls, such as rot or unsafe wiring. If we find one of those, we stop, show you, and price it in writing before continuing.
Do I need to buy appliances myself?
Either works. You can buy your own, or choose from our suppliers. We need final appliance models early, because cabinet openings are built around exact dimensions.