Shower remodeling and walk-in showers

A good shower is mostly built where you'll never see it. We waterproof every wet surface, slope the floor to the drain, test it, and then finish it with tile and glass you'll enjoy every morning.

Glass-enclosed walk-in shower with marble-look wall panels beside a bidet toilet and window

Showers are the most-used and most water-exposed part of a house. A shower that's built right lasts decades. One that isn't can look fine for a couple of years while water quietly reaches the framing behind it. That's why we spend most of our care on the layers under the tile.

Shower projects we build

  • Walk-in tiled showers: custom size and layout, with benches, niches and glass.
  • Tub-to-shower conversions: replacing an unused tub with a walk-in shower in the same space.
  • Curbless showers: a level entry with no step, for a clean look and easier access.
  • Tub and shower combinations behind glass, for rooms where a tub still needs to stay.
  • Shower updates: new valves, fixtures and glass where the waterproofing behind the tile is still sound.

How we build a shower that lasts

  1. Demolition to the studs so we can see the condition of the framing and fix any old water damage.
  2. Plumbing: a new pressure-balancing or thermostatic valve, set at the right depth for the finished wall, and a handheld sprayer if you want one.
  3. Sloped floor: built so water heads to the drain from every corner, including linear drains along a wall.
  4. Waterproofing: a continuous membrane on the walls and floor, sealed at every seam, corner, niche and pipe.
  5. Flood test: we fill the shower pan and let it sit before any tile goes on.
  6. Tile, then glass: tile set flat with even grout lines, then custom glass measured and installed once the tile is done.

Details worth planning

Bench

A built-in bench is useful for shaving and sitting, and a good place for a handheld sprayer to reach. It needs to be planned before waterproofing, not added later.

Niches

A recessed niche keeps bottles off the floor. We place it on a wall without plumbing, at a height that suits the people using it, and line it up with the tile layout so the cuts look intentional.

Fixtures

A thermostatic valve holds your chosen temperature even when someone flushes. A rain head is relaxing; a wall head is better for rinsing quickly. Many clients choose both, plus a handheld on a slide bar.

Glass

Frameless glass makes a bathroom feel bigger and shows off the tile. A fixed panel with an open entry can skip the door entirely in a larger shower.

Tile

Large-format panels mean fewer grout lines to clean. Smaller tiles on the floor grip better. Matte finishes hide water spots better than polished ones. More on bathroom tile.

Signs your current shower needs more than new tile

Sometimes a regrout or new fixtures will do. These signs usually mean the problem is behind the tile, and the shower should be rebuilt:

  • Loose or hollow-sounding tiles, which often mean the backing behind them has softened from moisture.
  • Grout that keeps cracking in the same spots, a sign the wall or floor is moving.
  • Stains or soft spots on the ceiling below or the floor outside the shower.
  • Persistent musty smell or mildew that comes back right after cleaning.
  • Water pooling in corners instead of flowing to the drain.

If you're seeing any of these, it's worth having us look before the damage spreads to the framing or subfloor. We'll tell you plainly whether a repair will hold or whether the shower needs to be rebuilt.

Cost and timeline

A new tiled walk-in shower typically runs $XX,000 to $XX,000 and takes 2 to 4 weeks of construction, plus time for custom glass. See the bathroom remodel cost guide for how tile, glass and layout changes affect the price.

Common questions

How much does a new walk-in shower cost?
A tiled walk-in shower typically runs $XX,000 to $XX,000, depending on size, tile, glass and whether the drain moves. A curbless shower adds floor work. See the bathroom remodel cost guide.
How long does it take to build a shower?
Most showers take 2 to 4 weeks of construction, plus 1 to 2 weeks after tile for custom glass to be measured, made and installed.
Do you install prefab shower kits?
Our focus is custom tiled showers and large-format panels, which last longer and fit the room exactly. If budget is the priority, we will talk through options at the consultation.
How do you keep a tiled shower from leaking?
Tile and grout are not waterproof, so the protection is behind them: a continuous waterproof membrane on every wet wall and the shower floor, sealed at seams and openings and flood-tested before any tile goes on.
What tile is easiest to keep clean?
Large-format porcelain panels have very few grout lines, so there is less to scrub. On the floor, smaller tiles with more grout lines give better grip underfoot.

Tell us about your project

We'll call within one business day to talk through scope and budget, then set up a free in-home estimate. No pressure, and no obligation.

Rather talk now? (555) 555-0123